East Coast Line: Difference between revisions
From Tardis Wiki, the free Doctor Who reference
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
{{wikipediainfo|East Coast Main Line}} | {{wikipediainfo|East Coast Main Line}} | ||
The '''East Coast Line''' was a [[Railroad|railway]] going along the eastern coast of [[Great Britain]]. It went through [[Darlington]], [[Newcastle]] | The '''East Coast Line''' was a [[Railroad|railway]] going along the eastern coast of [[Great Britain]]. It went through [[Darlington]], [[Newcastle]] and [[Edinburgh]]. | ||
In [[2011]], [[Barbra]] was assigned by [[ | In [[2011]], [[Barbra]] was assigned by [[MIAOW]] to investigate a supernatural creature causing trouble on the East Coast Line. ([[PROSE]]: ''[[Enter Wildthyme (novel)|Enter Wildthyme]]'') | ||
== Behind the scenes == | == Behind the scenes == |
Revision as of 12:02, 6 October 2020
The East Coast Line was a railway going along the eastern coast of Great Britain. It went through Darlington, Newcastle and Edinburgh.
In 2011, Barbra was assigned by MIAOW to investigate a supernatural creature causing trouble on the East Coast Line. (PROSE: Enter Wildthyme)
Behind the scenes
Location information
Though it's possible that a real world location doesn't exist in the same geographic space in the Doctor Who universe, such cases are few and far between. Thus, the map to the right is probably a good indicator of the DWU location of East Coast Line.