1st Team: Difference between revisions
From Tardis Wiki, the free Doctor Who reference
(Created page with "The '''1st Team''' was a Coal Hill Academy football team, of Year 11/12 students. Coach Dawson was its coach, and Carroll his...") Tag: sourceedit |
No edit summary Tag: sourceedit |
||
Line 1: | Line 1: | ||
The '''1st Team''' was a [[Coal Hill Academy]] [[football]] team, of Year 11/12 students. [[ | The '''1st Team''' was a [[Coal Hill Academy]] [[football]] team, of Year 11/12 students. In [[2016]]<ref>In ''[[The Coach with the Dragon Tattoo (TV story)|The Coach with the Dragon Tattoo]]'', we see a sign that tells us the [[Barbara Wright Building]] was completed in spring [[2016]].</ref>, [[Dawson (For Tonight We Might Die)|Coach Dawson]] was its coach, and [[Carroll]] his assistant. | ||
[[Ram Singh]] was the team's star player, ([[TV]]: ''[[The Coach with the Dragon Tattoo (TV story)|The Coach with the Dragon Tattoo]]'') but after he sustained an injury, losing one of his legs and having it replaced with a [[Lothan]] [[prosthetic leg|prosthetic]], ([[TV]]: ''[[For Tonight We Might Die (TV story)|For Tonight We Might Die]]'') he played poorly, and Dawson moved Ram to the [[2nd Team]]. There was no 3rd Team. ([[TV]]: ''[[The Coach with the Dragon Tattoo (TV story)|The Coach with the Dragon Tattoo]]'') | |||
== Footnotes == | |||
{{reflist}} | |||
{{Coal Hill School}} | {{Coal Hill School}} | ||
[[Category:Football clubs]] | [[Category:Football clubs]] | ||
[[Category:Coal Hill School]] | [[Category:Coal Hill School]] |
Revision as of 09:03, 24 October 2016
The 1st Team was a Coal Hill Academy football team, of Year 11/12 students. In 2016[1], Coach Dawson was its coach, and Carroll his assistant.
Ram Singh was the team's star player, (TV: The Coach with the Dragon Tattoo) but after he sustained an injury, losing one of his legs and having it replaced with a Lothan prosthetic, (TV: For Tonight We Might Die) he played poorly, and Dawson moved Ram to the 2nd Team. There was no 3rd Team. (TV: The Coach with the Dragon Tattoo)
Footnotes
- ↑ In The Coach with the Dragon Tattoo, we see a sign that tells us the Barbara Wright Building was completed in spring 2016.